MCO

Orlando GSE Phase 1

AFCO operates the only purpose-built, multi-tenant GSE maintenance facilities at Orlando International Airport. Construction of the first facility was completed in September 2009 and in March 2019 for the second. The site is ideal for state-of-the-art GSE maintenance operations, with an airside equipment staging area, complete with equipment wash bay facilities.

Projects at this airport:

Other projects at this airport:

Specifications

schematic of MCO building A

38,200 s.f. building
17 bays
25′ bay width
18′ bay height
90′ bay length
17 airside roll-up doors, electronically operated
15′ door height
16′ door width
75 auto parking positions
750 s.f. of equipment staging area per bay

  • For leasing information, please fill out the form below, or send us an email at leasing@aviationfacilities.com and we will get back to you soon.

Address and Directions: