RSW
Project Delivery: Late 2023
Southwest Florida Int’l Airport (RSW)
AFCO is currently developing a 28,000-sf on-airport facility at RSW with ample employee, visitor, truck, and outside storage areas. Airfield access and a shared loading/pass-through dock will be available.
Delivering in the fourth quarter 2023, AFCO’s cargo development at RSW will provide airfield access and a shared loading/pass-through dock. Located on the south side of the airfield and near the new passenger terminal, this facility will support one of the fastest-growing airports in the U.S.
Opportunity Highlights
Location: Nearest airport support facility to passenger terminal
Building Size/Opportunity: Approximately 3 acres; 28,000-sf facility; 4,000-sf bays
Apron Size: Apron Size is 350’x80 for total of 28,000 sf
Access:Secured access to RSW airfield interior road systems; easy public access to I-75
Building Size/Opportunity: Approximately 3 acres; 28,000-sf facility; 4,000-sf bays
Apron Size: Apron Size is 350’x80 for total of 28,000 sf
Access:Secured access to RSW airfield interior road systems; easy public access to I-75
Address and Directions:
Leasing Contact
Jennifer Brody